Estimator estimator action
Manager reviewer/approver action
Conditional only when the job requires it
Automatic the program performs this work
- A. Start the bid · Step 1Estimator Start a new bidClick . Save any bid already open before replacing it.
- B. Load bid documents · Steps 2–4Conditional Upload the spec book or RFP first (optional auto-fill)Use a searchable PDF, DOC, DOCX, or TXT. Review and correct every value the program fills automatically.
- Conditional Drop the symbol legend or device schedule (coverage checklist)The program reads the device types off it and asks you for any count you have not dictated yet — your completeness checklist. It never counts anything itself.
- Estimator Upload every addendum and confirm none are missingInclude written addenda, revised sheets, and the deliberate “no addenda issued” answer when applicable.
- C. Complete Project Setup · Steps 5–24Estimator Enter or verify the project nameUse the official project name from the solicitation.
- Estimator Enter the exact bid due date and timeMatch the solicitation, including the time zone. This controls deadline warnings and saved-bid ordering.
- Estimator Enter the GC, agency, or clientUse the organization that will receive the bid.
- Estimator Select the estimator doing the takeoffChoose the person responsible for the quantities and bid record.
- Estimator Select the salesperson shown on the proposalVerify the displayed name, title, email, phone, and office.
- Estimator Choose the delivery methodSelect Plan-and-Spec or Design-Build as required by the job.
- Estimator Enter or verify the project locationUse the correct city and state because location affects wages, pricing, availability, and travel.
- Estimator Enter or verify the code jurisdictionConfirm the applicable code edition, local amendments, and authority having jurisdiction.
- Estimator Select the project typeChoose new construction, renovation, tenant improvement, addition, or the closest accurate option.
- Estimator Select every discipline included in the bidCorrect every auto-selected chip. Include all bid scope and remove only work clearly by others.
- Estimator Verify ceiling and floor-to-floor heightsKeep detected/default heights only when the drawings support them.
- Estimator Verify the plan sheet sizeChoose the actual drawing size to support scale and pathway calculations.
- Estimator List specific items that must be includedName unusual devices, owner requirements, alternates, or items needing special attention.
- Estimator Enter known quantities for an accuracy cross-checkUse confirmed schedule or manual counts only as a verification reference.
- Estimator Choose the correct wage typeMatch standard, prevailing-wage, Davis-Bacon, or other solicitation requirements.
- Conditional If prevailing wage applies, select the correct county/state/metroDo not continue with an unresolved wage jurisdiction.
- Estimator Choose the work shiftAccount for normal hours, nights, weekends, occupied work, and restricted access.
- Estimator Confirm whether this is transit or railroad workEnable the specialized cost and labor treatment when required.
- Estimator Confirm whether all divisions are self-performedTurn this on only when bidding as the prime and carrying all applicable divisions.
- Conditional Add the prior estimate when one existsUse a relevant prior bid for comparison and account for scope differences.
- D. Complete pricing setup · Steps 25–32Estimator Open pricing and cost settingsDo not accept hidden defaults without checking them.
- Estimator Choose the estimate depthSelect the level appropriate for the bid’s size, risk, and document quality.
- Estimator Choose the pricing tierMatch the material source quality and purchasing position available for this project.
- Estimator Verify the regional multiplierConfirm the selected region matches the actual project market.
- Estimator Apply the approved pricing preset or target marginUse the company-approved preset or a specifically authorized custom target.
- Estimator Verify every labor classification and rateCheck technicians, foremen, project management, engineering/programming, and all other displayed rates.
- Estimator Verify burden is included only when appropriateChoose deliberately and confirm the burden percentage.
- Estimator Verify material, labor, equipment, and subcontractor markupsThese values directly affect the customer price.
- E. Review the setup · Steps 33–40Estimator Continue to the review stepClick after all Project Setup warnings are resolved.
- Estimator Review the project summary and all uploaded file countsCompare the project, disciplines, formats, specifications, plans, and addenda to the solicitation.
- Estimator Review the estimated accuracy and fix weak inputs if neededReplace unreadable files, correct scale information, and resolve quality warnings before analysis.
- Estimator Add final estimator notes and special instructionsInclude scope priorities, exclusions to investigate, special counts, and customer directions.
- Estimator Save the draft before analysisConfirm the save succeeds so the setup can be recovered.
- Estimator Continue — voice-first bids skip analysis hereWith no plans uploaded there is nothing to analyze; the program goes straight to Travel & Costs. Your quantities come from Voice Takeoff at Step 48.
- Conditional Answer every clarification using the specificationsAppears only on legacy analyzed bids. Do not guess — check the source documents for every response.
- Conditional Continue only after every clarification is answeredAppears only on legacy analyzed bids. Resolve every required question before the program proceeds.
- F. Complete Travel & Costs · Steps 41–47Estimator Review the labor hours and crew recommendationCompare total hours, crew mix, and duration with field experience and project constraints.
- Estimator Choose travel/per diem or confirm this is a local jobUse only when travel truly does not apply.
- Estimator Choose the scheduling method, crew, days, and mobilizationsUse By Techs or By Schedule and confirm the resulting person-days and trips are realistic.
- Estimator Enter and verify all travel costsInclude hotel, per diem, mileage, airfare, rental car, parking, tolls, and other actual costs.
- Estimator Enter permits, insurance, bonding, rentals, fuel, and bufferEnter zero only when the cost will not occur and avoid double-counting costs carried elsewhere.
- Estimator Review the complete travel and incidentals totalConfirm every included cost and the total added to the bid.
- Estimator Continue to ResultsClick . Voice-first bids go straight to the Results screen; legacy analyzed bids still pass the pin review first.
- G. Voice takeoff & coverage · Steps 48–54Estimator Open Voice Takeoff and dictate every count and noteClick the toolbar button. Read your counts off the drawings out loud —
twelve dome cameras on the second floor,three hundred feet of cat6— or type them. Saywe're in the lobbyto tag locations andscratch thatto undo. - Estimator Send the takeoff to the bid, then Apply the priced linesClick on the capture page, switch back to this tab, review the catalog pricing on each line, and click . Lines land as draft manual BOM items.
- Conditional Work the Legend Coverage card until nothing is missingIf you dropped a legend at Step 3, every device type it lists must end green: dictate a count for it or mark it .
- Conditional Accept or adjust the cable suggestions from your device countsThe program derives homerun cable by the average-drop method — 150 ft per data drop, 90 ft per card reader, 120 ft per camera. Adjust the average for this building, then . If you dictated cable yourself, it stands aside.
- Estimator Confirm the takeoff total before the deep reviewSanity-check the BOM grand total against your gut number for the job. Price every $0 “unpriced” line with your real cost.
- Conditional Legacy plan bids only: return to the large green review buttonApplies only to older bids that ran the plan analysis. Voice-first bids skip 53–54 entirely.
- Conditional Legacy plan bids only: PUSH TO OK THE REVIEWOn a legacy analyzed bid, press once to apply the reviewed counts and unlock reports.
- H. Review Results & RFIs · Steps 55–66Estimator Review the final bid total and Bid Readiness scoreCompare the total and cost breakdown with the expected range. Follow every Bid Not Ready or Review Recommended instruction.
- Estimator Open Diagnostics and resolve every warning or sanity issueClear blocking math, scope, count, page, safety, and integrity findings.
- Estimator Review and edit every BOM quantity, price, and labor valueVerify count-source badges and all high-dollar or unverified lines; add missing scope and remove out-of-scope items.
- Estimator Review exclusions, assumptions, and clarificationsEdit every statement so it matches the actual scope and protects the company.
- Estimator Open Workbench and complete the pre-bid reviewReview Dashboard, Estimate Summary, Scope Validation, Risk/CO Exposure, Value Engineering, and Quote Comparison.
- Estimator Review, select, and export the required RFIsKeep only relevant questions, edit them for clarity, and obtain required answers before finalizing the bid.
- Manager Have the manager mark the bid as reviewedThe manager checks pins, scope, pricing, exclusions, RFIs, and Workbench notes, then records a useful review note.
- Estimator Check the ready-for-submission confirmationCheck it only after the displayed total, scope, documents, and manager review are correct.
- Manager Approve and submit the bid internallyComplete the internal approval before generating the customer deliverable.
- Estimator Generate the Full Proposal in WordGenerate it only from the approved final pricing and scope.
- Estimator Open the downloaded proposal and proof every page and dollarVerify customer/project names, total, alternates, addenda, scope, exclusions, credentials, review stamp, signatures, and attachments.
- Estimator Open Compliance after the proposal is approved and proofedDo not start submission until the approved proposal has been fully proofed.
- I. Compliance, approval, and delivery · Steps 67–75Estimator Complete every compliance filing that applies to this bidFinish applicable DBE/SBE/MBE, DAS, COI, bid-bond, subcontractor, and site-walk requirements.
- Estimator Open the Approval Chain tabUse the formal chain required for public, large, or high-risk bids.
- Manager Enter approvers and obtain every required approvalCorrect any rejection and resubmit until all required approvers show approved.
- Estimator Open the Send / DocuSign tabUse the delivery workflow only after compliance and approvals are complete.
- Estimator Confirm the To and CC recipientsMatch the solicitation and verify every email address.
- Estimator Proof the subject and complete email bodyInclude the correct project and bid identification without exposing internal notes.
- Estimator Choose the delivery methodSelect email, DocuSign, portal, or the exact method required by the customer.
- Estimator Open the email, attach the approved proposal, and send itAttach every required form, signature, bond, and supporting document; then deliver before the deadline.
- Estimator FINAL: after delivery succeeds, mark the bid as sentReturn to The New Terminator, click , save the final record, and retain delivery confirmation.
Do not send the bid if any of these are true
- The Legend Coverage card still shows a device type with no count and no N/A decision.
- A dictated line is still at $0 “unpriced” without your real cost entered.
- The displayed total is $0, unexpectedly low/high, or does not reconcile with the BOM.
- A selected discipline has zero devices without a documented reason.
- Unit Mix is detected but not approved.
- Prevailing-wage rates are required but unresolved.
- A blocking integrity, count, math, page, or scope finding remains open.
- The proposal total or scope differs from the manager-approved bid.
- The submission package is missing a customer-required form, signature, bond, or attachment.